Aller au contenu

Systematic Factory: démo complète

Du vrai travail dans le vrai système, du premier devis à la commande expédiée et à son coût.

Voir Systematic Factory

Chapitres

  1. 0:00Présentation
  2. 0:13Tableau de bord
  3. 0:31Bureau d'études
  4. 2:20Configurateur
  5. 2:44Ventes
  6. 3:49Ordres de fabrication
  7. 4:12Planification
  8. 4:49Achats
  9. 5:24Ordonnancement
  10. 5:44Atelier
  11. 6:24Sous-traitance
  12. 6:38Coût réel
  13. 7:01Stocks
  14. 7:34Qualité
  15. 8:14Maintenance
  16. 8:38Expédier et facturer
  17. 9:12Comptabilité
  18. 9:50Votre système

Transcription

Systematic Factory runs a factory from end to end: sales, engineering, planning, the shop floor, quality, maintenance, and accounting. One system, one unbroken record.

The day starts on the dashboard: active jobs, open sales orders, overdue invoices, receipts waiting to be posted, stock below its reorder point, and machines under maintenance, all on one screen. Each person sees the cards their role allows, and every card opens the list behind it.

Everything the factory touches is an item. Parts it makes or buys, raw materials described by grade, shape and size, tools, consumables and services, each with its own unit of measure, its own tracking, by serial, by batch or not at all, and its own costing method.

The pump is built level by level. The PX-200 is made from a housing, an impeller, a shaft, a cover and a motor adapter, and each of those is made from its own parts and materials. Every line says whether it is made here, bought, or pulled from stock, and how many go into one pump.

Each part that is made has its routing. The shaft is cut from bar, turned, sent out for heat treatment, ground, and checked, each operation on its own work centre, with its setup, labour and machine time. The heat treatment is not done in house, so the routing says which supplier does it, and the job will carry that step like any other.

And each operation carries the instructions the operator follows on the floor, step by step, with the measurements to record and their limits. Tasks to tick, values to type, checks to sign: nothing on the floor depends on memory.

Its cost rolls up through every level: the material, the labour and machine time at each work centre's rate, the overhead and the work done outside. Recalculate, and the pump's unit cost is known before a single part is made.

Assembly instructions are built from the 3D model itself. Each step shows which part goes in and how it moves into place: the shaft into the housing, the seal, the impeller, then the cover, and the operator plays them one step at a time.

And a design change is never made in place. It goes through a change notice, with the new revision drafted, reviewed against the old one, approved and released on a date.

The PX-200 is sold in many variants from one part number. On the quote, the customer's choices of flow rate, voltage and seal type are entered, and the rules behind them set the bill of materials, the routing and the price for that exact pump. Change a choice, and the pump's parts, its operations and its price change with it, so every variant is costed as precisely as the standard one.

Sales starts with the customer. Customer fourteen sends a request for quote, and each line of the request is matched to a part, so nothing is typed twice.

On the quote, every line carries its own bill of materials and its own routing, the same structure engineering built, so the cost behind the price is real: every part, every operation, every hour. Open the tree, and the whole pump is there, down to the bar stock and the bolts.

Ten, fifty or two hundred pumps: each quantity has its own material, labour and outside cost, its own unit cost, and the total. The margin is read before the price is sent, not after the order is lost.

And the pricing trace shows, step by step, which price list or rule set the price, so nobody has to guess where a number came from.

The quote goes out as a PDF from the company's own mail, and the customer opens it on a private link, with no account to create.

Won, the quote becomes a sales order in a few steps: the customer's purchase order number, the quantities agreed on each line, and the order is created, carrying that reference on every document that follows.

From the sales order, production jobs are made for its lines, each job with its own copy of the method, so a change on one job never touches the master, and each job stays linked to the order it serves. Each job knows its due date, its customer and its quantity, and lists the materials it needs and the operations it will go through.

A job is released to the floor once its materials and method are ready.

Material planning projects every item week by week, from orders, jobs, forecasts and reorder points, and shows the first week its stock goes below zero.

On the purchasing side, the 2.2 kilowatt motor is short. Its reorder policy, supplier and lead time are already there, and the order is placed from the suggestion itself.

Expected demand is entered week by week, and real orders consume it as they arrive. And on the line, kanban cards reorder by themselves: a scan buys more, makes more, or moves stock from another bin. Nobody has to remember to reorder a washer.

Castings go out for quote to several suppliers at once. Each supplier prices their quantities and lead times on a private link, the answers are compared side by side, and the best one becomes a purchase order.

Goods are received against the purchase order, each batch with its own number, and items that need inspection are held until a sample, sized by the standard sampling tables, is measured and accepted. A batch that fails stays on hold, and never reaches the line.

And when the supplier's bill arrives, it is matched to the order and to what was really received, before it is posted.

The schedule places every operation on the real hours of each machine and each qualified operator.

Outbound shows what finishes each day, for which customer, and when it was promised.

And the customer follows their own order on a private portal: every job, every operation, done or waiting, without picking up the phone.

On the shop floor, the operator's station shows the work centre's queue in order, with the part, the step and when it is due. No paper travels with the parts; the station is the instruction, the record and the clock.

Opening an operation shows what is completed, what is scrapped and the due date, and starting it starts the clock, so the real hours are captured as the work is done.

Each step is recorded as it is done. A measurement outside its limits is refused, measured again, and accepted within them.

Scrap is recorded with its reason, and counted against the job.

And the good quantity is logged as complete, ready for the next operation.

Work done outside is tracked like work done inside. The heat treatment of the shafts is an outside operation, on a purchase order to the heat treater, tied to the job, so everyone knows where the parts are and what the step costs.

Production shows how each work centre is used, and every job compares what it was expected to cost with what it really cost: the material issued, the time logged at each work centre's rate, and the scrap. The difference is never a surprise at month end; it is on the job while the job is running.

And scrap is analysed over time, so the losses that cost the most are seen and dealt with.

Stock sits in storage units, aisle, rack and bin, and for every item the system shows what is on hand, on order and committed to jobs, location by location.

Materials are picked to the line on picking lists, and stock counts run against a frozen snapshot, so the differences are reviewed and posted, never typed over.

And any serial number can be traced: every batch and every part inside the pump, where each came from, and where the pump went. If a batch of seals turns out to be faulty, the pumps that used it are found in seconds.

A defect is opened as a quality issue, linked to the item, the supplier and the exact units, and worked through its steps: containment, root cause, and the corrective actions, each one assigned and dated. The supplier answers their corrective action on their own private link.

Every affected unit gets its decision: use as is, rework, scrap, or return to the supplier.

Measuring gauges carry their calibration status, and one that is out of calibration is flagged. First-article inspection plans are drawn on the drawing itself, with a numbered balloon for every dimension.

And quality is seen at a glance: open issues, actions and the trend over time.

When a machine breaks down, a maintenance dispatch records the work centre, the priority and the impact on output, and preventive maintenance runs on its own schedule.

Mean time to repair and the machines that fail most are measured. The figures come from the dispatches themselves, so they cannot be dressed up.

Trainings give operators the abilities their processes require, and shifts set the working hours of people and machines.

The order is shipped, its shipment posted against the sales order, and the invoice is created from what was shipped, so what is billed is exactly what went out.

Credit notes are applied, and what each customer owes is aged, current, thirty, sixty or ninety days and more.

And when a customer returns a pump, the return is authorised, received, inspected and decided, then credited or replaced.

And service contracts bill themselves: here, the PX-200 annual service, at four hundred and fifty dollars a month, with each invoice planned on its own schedule.

The accounts are the factory's own: its chart of accounts, the default account each kind of transaction posts to, and dimensions to tag every line by location, department, work centre or project.

Every receipt, issue, time entry, shipment and invoice has already written its own journal, line by line, with no re-entry. Material, labour and overhead move into work in progress as the work happens, and out to finished goods when the job is complete.

The inventory valuation is read from the same records, location by location.

The income statement comes straight from them, and each month is closed with its own period.

Each employee has an account and a role, and sees only what that role allows. Every change can be followed in the audit log, and the whole company is backed up from Settings. Permissions are set module by module, for viewing, creating, changing and deleting.

And it all runs on the factory's own server, with no subscription. In English, French or Arabic, with every page tested on a million records, and no internet needed to run it.

Every pump traces back to its quote, its materials, its operators and its cost, in one system, on your own server. Systematic: Custom software, systems, and infrastructure.